Johnny and Connie moved into their new home Aug 4, 2003
(see construction progress below)
Johnny
and Connie Crippen |
Watch
the construction of Johnny &Connie's home
see the plans Elevation
Main Level Lower
Level
see our selections Selections
| 1. The Vacant Lot
(6/16/02) 2. Site Clearing (9/5/02) 3. Preparing for the Foundation 3a. Pier (9/16/02) 3b. Footing (9/23-24/02) 3c. Forms (9/25/02) 3d. Basement (9/26/02) 3e. Plumbing (10/04/02) 3f. Backfill (10/07/02) 4. Pouring the Foundation (10/22/02) 5. Framing (10/15/02) 5a. Main Level (10/28/02) 5b. Roof Erection (11/09/02) 5c. Roof Decking (11/21/02) 5d. Garage Poured (12/05/02) 5e. Windows - Main Level (12/28/02) 5f. Framing Cont. (1/28/03) |
6. Mechanicals 6a. Garage Doors (2/20/03) 6b. Plumbing 6c. Heat and Air (2/26/03) 6d. Telephone, Data, CATV (2/26/03) 6e Electrical (2/26/03) 7. Roofing (2/19/03) 8. Sheetrock (3/24/03) (4/18/03 completed) 9. Stucco (3/8/03) (4/18/03 completed) 10. Texture (Walls) (6/17/03) 11. Trim (Molding/Cabinets) (4/25/03) 12. Paint (Walls/Ceilings) 13. Floor, Kitchen and Bathroom Tile (7/1/03) 14. Flatwork (7/7/03) 15. Flooring (4/21/03) 16. Landscaping 17. Interior (12/21/03) |
Architect:
construction by Moss Custom Steel-Framed Homes,
Inc.
Lockwood Architects, Inc.
5388 W. 95th. Street
Prairie Village, KS 66207
Larry Lockwood (913) 642-3871 lglock@sprintmail.com
Selections (return)
Roof - MonierLifetile - Split Dutch - Outback HB C/T 1VDCH3046(1702HB) - Example
(Villas at Ironhorse - 15229 Birch)
Bathroom -
Entry Door
(return)